LuxuryAde is a Chinese PEMF mat manufacturer, produced and supplied by Sheyang Haoyue Liyu Products Co., Ltd. The factory has been producing amethyst mattresses, tourmaline mattresses, jade mattresses, PEMF photon pads and far-infrared thermal therapy pads since 2004, providing standard products and OEM/ODM manufacturing services to overseas brands, importers, wholesalers and equipment channels.
PEMF Thermal Therapy Pad Manufacturing Capabilities
| Manufacturing Project | Production Capacity |
|---|---|
| Product model | Various product models and customized sizes |
| PEMF system | 2 coils or 6 coils, 8 fixed frequency programs and 1 random program |
| Temperature control system | 35-70°C temperature control, 90°C bimetal overheating power-off protection |
| Photonic System | 660 nm red or 660 nm + 850 nm dual-band configuration |
| Gemstone system | Amethyst, black tourmaline and various natural gemstone combinations |
| Brand customization | Logo, fabric, controller, label, instruction manual and packaging |
Manufacturing Quality and Product Certification
PEMF heat therapy pad adopts a layered structure, including PU leather, high-density nylon mesh, natural gemstone layer, nano bamboo charcoal cotton, photon lamp layer, Oxford waterproof cloth, electromagnetic isolation layer, aluminum foil reflective layer, heating resistor, temperature sensor and thermal insulation layer.
- Product certification: CE LVD, CE EMC.
- Manufacturer management system: ISO 9001:2015, ISO 13485:2016.
- Voltage configuration: AC 110V/220V.
- Standard warranty: 1 year.
OEM PEMF Mat Manufacturer Service
LuxuryAde provides private label PEMF mat and OEM/ODM production services. Customized projects cover product size, color, natural gemstones, PEMF procedures, photon wavelengths, power specifications, plugs, Logo, product labels, instruction language and export packaging. Full OEM/ODM custom MOQ is 100 pieces.
Production and delivery date
| Order quantity | Production and delivery time |
|---|---|
| 1-10 pieces | 5 days |
| 11-100 pieces | 7 days |
| 101 pieces and above | 10 days |